Monday, May 25, 2009

Boat Progress

This is a picture of the finished floor with new carpet glued down and ski locker trim back on. The carpet matches really good with the old carpet. Can't wait to get the motor running and take the boat out on the lake and enjoy it!

This is a picture of the carpet before it got glued down. It was cut and dry fitted.
This is the floor after I put Fiberglass Resin on the pressure treated plywood. It needed the fiberglass resin so the floor wouldn't rot as quickly.


This picture is of the first 1/2" layer of pressure treated plywood that was put down.




This is another picture showing that there are now two 1/2" sheets of pressure treated plywood on the floor. It is really strong and shouldn't rot out any time soon.



No comments: